Title | Porto Alegre 1994 |
Creator | Álvaro Gehlen
de Leao |
Website | http://iprod.auc.dk/x-proj/gamespm/www-games.html |
Topic | Production management |
Synopsis of game |
To present the simulation of a manufacturing system based on war game concepts, such as chess and Checkers. The participants attempt to reach pre-established goals via strategic and tactical plans.
|
Presumed knowledge | Main production principles |
Time Required to
read instruction |
|
Time Required to
play a round |
Two hours |
Number of Players |
Decision Center |
Lenson Learned |
The game is applied in teaching various concepts of industrial engineering and in particular in modeling and simulating manufacturing systems. Furthermore it is suitable for cost management and performance measurement courses. |
Free or pay? | |
Play online or download? | |
Demo Picture | |